Résultats (
Anglais) 3:
[Copie]Copié!
The site will be conducted so as to limit the damage of the sea in the event of bad weather on the books in the course of construction, to allow the possibility of intervention in head of yard as long time as possible if the wrong time is lifted, to allow the withdrawal of the equipment in safety zone when the need arises.
En cours de traduction, veuillez patienter...