The contractor will perform a check of mass of the blocks by weighing. This checks will be performed before the transport of the block at his final implementation.Controlled blocks will be weighed with a precision better than 0.5%.The company will weigh 2% of the blocks, one by one or by groups of 2 or 3 following the indications of the master of work.The tolerance on the weight of the blocks is of + or - 2% of the theoretical weight.