Résultats (
Anglais) 3:
[Copie]Copié!
In the absence of these documents, the engineer will require the testing of receipt which will be executed at the expense of the Contractor in an approved laboratory, before acceptance of materials by the Engineer
En cours de traduction, veuillez patienter...
